• Abakelia St. 11, Tbilisi, Georgia
  • info@sabagroup.org
  • +995 322 99 54 06
  • GE
  • GE

Terjola

Rehabilitation of Terjola drinking water system

MDF (municipal development fund of Georgia) and Kainat Techtizad Tikind

527 726,07 GEL

December 2016- March 2017

  • Installation of drinking water pipes – 920m
  • Connection  worksAsphalt arrangement works
  • Asphalt arrangement works-1380m.
  • watermeters installation
  • Watermeter and valve wells installation -  15 pieces