• Abakelia St. 11, Tbilisi, Georgia
  • info@sabagroup.org
  • +995 322 99 54 06
  • GE
  • GE

Sachkhere

       Rehabilitation of Sachkhere Water supply system

  • Installation of PE pipes from DN 25 up to DN 160 – 22 272  m
  • Installation of Reinforced concrete wells – 27pieces
  • Installation of Fire hydrants – 5 pieces
  • Asphalt works– 500m2

Sachkhere Municipality

639,983.32 GEL

April 2016 – November 2016

  • Installation of PE pipes from DN 25 up to DN 160 – 22 272  m
  • Installation of Reinforced concrete wells – 27pieces
  • Installation of Fire hydrants – 5 pieces
  • Asphalt works– 500m2